Retaining & Earth Pressure

Sheet Pile Wall Design (Cantilever & Anchored)

Embedment depth, maximum bending moment and anchor force for cantilever and anchored sheet pile walls (free and fixed earth support) in layered soil with water.

USS Steel Sheet Piling Design ManualBlum (1931)CIRIA C580EAU 2012

Inputs

Demo

Wall Cross-Section

H = 5.00 mDRetained sideExcavation level

1. Wall Type & Geometry

Top of wall to excavation level

Uniform, on the retained side

2. Soil Layers

Depths are measured from the top of the wall on the retained side. The last layer continues below the toe. For undrained clay, enter φ = 0 and the undrained shear strength su as c.

Layer 1
Continues down

3. Groundwater

Seepage: head lost uniformly along the wall; matters only where the water levels differ

Depth below top of wall; leave blank for dry soil

Depth below top of wall; less than H for free water in front

4. Design Margins & Steel Section

Passive pressure ÷ Fp; 1.5–2.0 is common when no extra embedment is added

Added to D₀: typically 20–40% with Fp = 1, less when Fp > 1

Often 0.6–0.65 fy, for the required section modulus

Results

Enter the retained height and soil layers above, or click a Demo Preset at the top to compute the embedment depth and bending moment.

Theory and formulae

Sheet Pile Wall Design Methods

About this calculator

This free sheet pile wall calculator runs entirely in your browser: what you enter is never uploaded. Switch between metric and imperial units at any time. Use the calculation steps and the theory section to check the working, and print a calculation sheet with the inputs, results and formulae for your records.

Methods and references: USS Steel Sheet Piling Design Manual, Blum (1931), CIRIA C580, EAU 2012.

Topics: sheet pile, cantilever wall, anchored wall, embedment depth, free earth support, fixed earth support, blum, equivalent beam, bending moment, anchor force, tie rod, section modulus.

Engineering notice: Results are for preliminary estimation, screening and education. All inputs and outputs must be independently verified by a qualified professional engineer before use in any design or construction decision. Read the full disclaimer