Foundations & Piles

Pile Group Efficiency & Settlement Calculator

Calculate pile group reduction efficiency (Converse-Labarre, Sayed-Baker), cohesive block failure capacity (Skempton), and 2:1 equivalent raft immediate & 1D consolidation settlement.

FHWA GEC-010TomlinsonAPI RP 2AAASHTO

Inputs

Demo

1. Pile Group Geometry & Layout

2. Single Pile Capacity & Applied Loads

3. Compressibility & Settlement Parameters

Theory and formulae

Theory & Formulae

About this calculator

This free pile group efficiency calculator runs entirely in your browser: what you enter is never uploaded. Switch between metric and imperial units at any time. Use the calculation steps and the theory section to check the working, and print a calculation sheet with the inputs, results and formulae for your records.

Methods and references: FHWA GEC-010, Tomlinson, API RP 2A, AASHTO.

Topics: pile group, group efficiency, converse-labarre, sayed-baker, block failure, equivalent raft, group settlement, consolidation, 2:1 method.

Engineering notice: Results are for preliminary estimation, screening and education. All inputs and outputs must be independently verified by a qualified professional engineer before use in any design or construction decision. Read the full disclaimer